Culbertson Elementary

-Bids due by noon on March 11, 2019. -Prebid walkthrough- Wed 2/27/19 3pm -Criminal & child abuse clearances -Allowances -Alternates -Phased construction- Start June 2019 to August 2020. -Sitework, selective demo, concrete, masonry, structural & misc metals, carpentry, millwork, roofing, metal panels, spray insulation, fluid air barrier, Doors/windows/hardware, aluminum & glass, drywall, acoustic, ceramic, painting, athletic flooring, specialties, stage curtains, athletic equipment, kitchen equipment, casework, wheelchair lift.


Drawings

Cover Sheet

Civil Drawings

Architectural Drawings

Structural Drawings

Food Service Drawings

Mechanical Drawings

Plumbing Drawings

Electrical Drawings

Fire Protection Drawings

Construction Set 3/22/19


Specs

Volume 1 - Part 1

Volume 1 - Part 2

Volume 1 - Part 3

Volume 2

Volume 5

Volume 3

Volume 4


Addendas

Addendum 1

Addendum 1 Drawings

Addendeum 3

Addendum 2

Addendum 2 Drawings


Status: None                        
Due Date: 2025-03-01 17:00:00
Estimator: John S. McManus
Estimator email: jmcmanus@jsmcmanus.com
Location: 3530 Goshen Rd, Newtown Square, PA 19073
Project Owner: None
Architect: Bonnet Associates Incorporated
Pre bid meeting: Prebid walkthrough- Wed 2/27/19 3pm